Synergy Group

Engineering & Power System Studies

Engineering & Power System Studies

Load flow, Short circuit, Transient stability, Insulation coordination, Reactor sizing, Neutral grounding reactor sizing, Neutral grounding resistor sizing, Grounding transformer sizing, Islanding, Load shedding, Auto reclose, Motor starting, Arc flash, Grounding, Slip power recovery, Black start, Power factor correction (Capacitor sizing), Motor re-acceleration, Circuit Breaker transient recovery voltage, Harmonic and power quality, Harmonic filter and Automatic Bus transfer.

Sub-synchronous resonance, Small signal stability, Power system stabilizer tuning, Flexible AC transmission system, Power plant integration studies (Conventional and renewable energy), HVDC, Real time digital simulation (RTDS), Synchronous condenser VAR support and inertia contribution, Battery Energy Storage System, Arc furnace, Smelter plant and User defined model development for Governor, Exciter, PSS, FACTS & HVDC.

Generator (Conventional & Renewable), Transformer, Line (Conventional & Series compensation), Busbar, Motor, Capacitor, Reactor, Synchronous condenser, Power factor controller and Bus transfer (Distance, Differential, Under Impedance, Negative Sequence, Loss of field, Rotor earth fault, Stator earth fault, Reverse power, Power swing, Thermal overload, Over current, Earth fault, Over/Under voltage, Over/ Under frequency, Out-of-step, Auto reclose and Tap changer)

Layout (Equipment, Lighting & Grounding), Calculations (Short circuit force, Lighting, CT sizing, VT sizing, Breaker sizing, Busbar sizing, Surge arrester sizing, Grounding, Voltage drop, Shielding, Cable sizing), Cable quantity estimation, Single line diagram, Relay metering one line diagram, Equipment sizing and specification, AC / DC schematic preparation, Interface diagram preparation, Substation automation system, Drawing conversion and As-built drawing preparation.

Power Factor improvement, Optimum Bus voltage study, Energy controller design and installation.

MV Switchgear, RMU, Power cable, VT, CVT, Transformer failure, Bushing failure, Surge arrester, Capacitor bank and Reactor.

Solar PV Equipment design specification and calculations, Switchgear sizing, Protection design, PV plant & Wind farm grid integration studies, Battery Energy storage study, Flexible AC Transmission System studies and Synchronous condenser studies.

GIS / AIS, MV Switchgear, LV Switchgear, RMU, Power cable, CT, VT, CVT, Power Transformer, Grounding transformer, Surge arrester, Grounding Resistor, Generator grounding transformer, Capacitor bank, Reactor, Harmonic filter, ATS, Battery, Lighting, Protection relays, Meters, Control cable etc.

Equipment data collection, Motor start current capture, Transformer ferroresonance analysis, Excess VAR, Protection mis-operation and Control scheme mis-operation.

Power system studies (Load flow, Short circuit, Transient stability, Harmonic load flow, ARC Flash, Insulation coordination, and Renewable power interconnection) Protection setting and Coordination (Over current, Earth fault, Differential, Distance, Motor, Capacitor, Generator, Reactor, Islanding and Load shedding).

our services

What we do

Global Contacts

Synergy Electrical Contracting Pvt. Ltd (HO)

Synergy & Pothigai Power Company

Energy Grid Solutions Company W.L.L

SYNERGY - GPT Corporation

Synergy Power Australia Pty Ltd

Need Help?